Infrastructure

Our NPI project delivery capability spans diesel infrastructure, ammonium nitrate facilities, dewatering systems and heavy vehicle washdown and maintenance.

Rio Tinto

Marandoo Southern Waste Fines Storage Facility

Primero are pleased to announce we have been awarded the pumping and piping package of work for the design and construction of the Marandoo Southern Waste Fines Storage Facility (SWFSF) in the Pilbara region of WA. Primero were selected to execute the EPC contract after providing Rio Tinto with an alternate design that reduced the amount of shutdown intervals required to deliver the works by 75%.

Learn More

FMGL

Solomon HME Workshop

The Solomon NPI facilities work consisted of three distinct projects involving a workshop and two fuel facilities.

A new three-bay workshop with 30T overhead traveling gantry crane provides additional floor space to allow the servicing of heavy haul trucks. The workshop design allows for jacking of Komatsu 930e vehicles and full opening of the tray.

Learn More

BHP

Mining Area C HME Workshop

The BHP Billiton Area C Mine is an operating iron ore mine located in the Pilbara region of Western Australia, 92km North-West of Newman. Opened in 2003, the Area C Mine produces 42 million tonnes per annum for export, via rail to Port Hedland.

Learn More